At the Dogleg left to Annapolis Rock

The last sunken section of the AT on the way north to Annapolis Rock received some attention in early September 2021. We installed 3 stone water bars here to direct water off the Appalachian Trail, placing a check dam directly below each water bar. We have also installed 2 other check dams and have reinforced an existing log dam and log water bar. There is more work needed so we’ll install a few more stone check dams in to slow the flow of water down the slope.

  • 1st stone water bar and check dam below - 2 miles n US40 - Maryland Appalachian Trail
    1st stone water bar and check dam below - 2 miles n US40 - Maryland Appalachian Trail

Early Spring 2021 – Controlling width of the AT to US-40 Parking Area Access Trail

Spring work at the US-40 Trailhead/Parking to Appalachian Trail. The trail was widening here. We added crushed to to trail first to keep from getting soggy and then constrained width with a line of stones. About 60 person hours volunteer work.

  • Adding stones along Access Trail to constrain width